ITAC Assessment: OK0370
ITAC logo
ITAC Assessment: OK0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DINNERWARE, ARTWARE
NAICS
n/a
SIC 3269: Pottery Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 300
ton
Production Hrs. Annual 3,500
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,961 470,106
kWh
Natural Gas $42,115 15,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $463 $2,810 $676
8,499
kWh
$(-20.0)
-
MMBtu
$(-193.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,226 $70 $2,296
65,064
kWh
- $(-70.0)
03 2.7261: Install timers and/or thermostats $3,047 $1,000 - $3,047
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $2,461 $405 - $2,461
-
MMBtu
-
05 2.3212: Optimize plant power factor $942 $1,125 $942
-
kWh
- -
TOTAL RECOMMENDED $9,139 $5,410 $3,914
73,563
kWh
$5,488
-
MMBtu
$(-263.0)
TOTAL IMPLEMENTED $8,197 $4,285 $2,972
73,563
kWh
$5,488
-
MMBtu
$(-263.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs