Assessment Year | 1992 |
---|---|
Principal Product | SENSORS AND SWITCHES |
NAICS |
n/a
|
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $5 M to 10M |
# of Employees | 190 |
Plant Area |
n/a
|
Annual Production | 2,600,000
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,159 | 738,277 |
kWh
|
$0.058 |
Natural Gas | $5,249 | 1,091 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,668 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $118 | - |
$118
2,052
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $249 | $119 |
$293
5,275
kWh
|
$(-44.0)
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $466 | - |
$864
14,361
kWh
|
$(-195.0)
-
MMBtu
|
$(-203.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $172 | $382 |
$197
3,224
kWh
|
$(-25.0)
-
MMBtu
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $128 | - |
$128
2,345
kWh
|
- | - | |
06 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,802 | $9,800 |
$2,802
36,049
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $100 | $120 |
$100
1,758
kWh
|
- | - | |
TOTAL RECOMMENDED | $4,035 | $10,421 |
$4,502
65,064
kWh
|
$(-264.0)
-
MMBtu
|
$(-203.0) | ||
TOTAL IMPLEMENTED | $3,668 | $10,302 |
$4,091
57,737
kWh
|
$(-220.0)
-
MMBtu
|
$(-203.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs