ITAC Assessment: OK0356
ITAC logo
ITAC Assessment: OK0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product INGOTS AND ANODES
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 125,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,646 6,796,893
kWh
Natural Gas $546,710 272,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $534 - $511
14,947
kWh
- $23
02 2.7261: Install timers and/or thermostats $254 $360 $109
3,224
kWh
$145
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $60,081 $58,228 $60,081
1,751,172
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,311 - $1,311
31,653
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,377 - $1,467
42,790
kWh
- $(-90.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,152 - $4,152
99,941
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,095 - $3,236
80,305
kWh
- $(-141.0)
TOTAL RECOMMENDED $70,804 $58,588 $70,867
2,024,032
kWh
$145
-
MMBtu
$(-208.0)
TOTAL IMPLEMENTED $70,804 $58,588 $70,867
2,024,032
kWh
$145
-
MMBtu
$(-208.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs