ITAC Assessment: OK0348
ITAC logo
ITAC Assessment: OK0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product READY-MIX CONCRETE
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area
n/a
Annual Production 101
thousand feet
Production Hrs. Annual 2,860
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,174 213,365
kWh
Natural Gas $6,446 1,781
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,500 - $2,500
38,980
kWh
-
02 2.7261: Install timers and/or thermostats $1,267 $400 - $1,267
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $292 - $292
4,396
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $321 $759 $321
4,396
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $132 - $132
2,052
kWh
-
TOTAL RECOMMENDED $4,512 $1,159 $3,245
49,824
kWh
$1,267
-
MMBtu
TOTAL IMPLEMENTED $4,512 $1,159 $3,245
49,824
kWh
$1,267
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs