ITAC Assessment: OK0346
ITAC logo
ITAC Assessment: OK0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DENIM JEANS
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 4,200,000
pieces
Production Hrs. Annual 2,025
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,454 1,350,234
kWh
Natural Gas $4,357 906
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,434

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $857 - $857
14,361
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,919 - $3,949
66,530
kWh
- $(-1,030.0)
03 2.2437: Recover waste heat from equipment $1,122 $866 - $1,122
-
MMBtu
-
04 2.7261: Install timers and/or thermostats $1,923 $1,500 - $1,923
-
MMBtu
-
05 2.7123: Keep lamps and reflectors clean $613 - $541
9,086
kWh
- $72
TOTAL RECOMMENDED $7,434 $2,366 $5,347
89,977
kWh
$3,045
-
MMBtu
$(-958.0)
TOTAL IMPLEMENTED $7,434 $2,366 $5,347
89,977
kWh
$3,045
-
MMBtu
$(-958.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs