Assessment Year | 1991 |
---|---|
Principal Product | PRE-STRESSED CONCRETE |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $1 M to 5M |
# of Employees | 55 |
Plant Area |
n/a
|
Annual Production | 110
thousand feet
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,419 | 640,094 |
kWh
|
$0.066 |
Natural Gas | $23,738 | 7,919 |
MMBtu
|
$3.00 |
Fuel Oil #2 | $4,500 | 658 |
MMBtu
|
$6.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,608 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,608 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $7,336 | - |
$7,336
-
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $448 | - |
$448
8,206
kWh
|
- | - | - | |
03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $1,653 | $1,800 |
$(-1,637.0)
(-29,894)
kWh
|
- |
$3,150
-
MMBtu
|
$140 | |
04 | 2.2515: Use optimum thickness insulation | $4,914 | $9,600 | - |
$4,914
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $328 | - |
$307
5,569
kWh
|
- | - | $21 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $117 | $65 |
$117
2,052
kWh
|
- | - | - | |
07 | 2.2123: Insulate feedwater tank | $41 | $66 | - |
$41
-
MMBtu
|
- | - | |
08 | 2.2441: Preheat boiler makeup water with waste process heat | $197 | $410 | - |
$197
-
MMBtu
|
- | - | |
09 | 2.7261: Install timers and/or thermostats | $574 | $1,050 | - |
$574
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $15,608 | $12,991 |
$6,571
(-14,067)
kWh
|
$5,726
-
MMBtu
|
$3,150
-
MMBtu
|
$161 | ||
TOTAL IMPLEMENTED | $15,608 | $12,991 |
$6,571
(-14,067)
kWh
|
$5,726
-
MMBtu
|
$3,150
-
MMBtu
|
$161 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs