ITAC Assessment: OK0333
ITAC logo
ITAC Assessment: OK0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PRE-STRESSED CONCRETE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 110
thousand feet
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,419 640,094
kWh
Natural Gas $23,738 7,919
MMBtu
Fuel Oil #2 $4,500 658
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,608

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $7,336 - $7,336
-
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $448 - $448
8,206
kWh
- - -
03 2.1321: Replace fossil fuel equipment with electrical equipment $1,653 $1,800 $(-1,637.0)
(-29,894)
kWh
- $3,150
-
MMBtu
$140
04 2.2515: Use optimum thickness insulation $4,914 $9,600 - $4,914
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $328 - $307
5,569
kWh
- - $21
06 2.7142: Utilize higher efficiency lamps and/or ballasts $117 $65 $117
2,052
kWh
- - -
07 2.2123: Insulate feedwater tank $41 $66 - $41
-
MMBtu
- -
08 2.2441: Preheat boiler makeup water with waste process heat $197 $410 - $197
-
MMBtu
- -
09 2.7261: Install timers and/or thermostats $574 $1,050 - $574
-
MMBtu
- -
TOTAL RECOMMENDED $15,608 $12,991 $6,571
(-14,067)
kWh
$5,726
-
MMBtu
$3,150
-
MMBtu
$161
TOTAL IMPLEMENTED $15,608 $12,991 $6,571
(-14,067)
kWh
$5,726
-
MMBtu
$3,150
-
MMBtu
$161
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs