ITAC Assessment: CO0157
ITAC logo
ITAC Assessment: CO0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product COMMERCIAL PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 5,120
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,013 3,019,930
kWh
Natural Gas $6,337 1,517
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $5,518 $250 $5,367
-
kWh
$151
-
MMBtu
02 2.6218: Turn off equipment when not in use $1,235 $800 $298
12,896
kWh
$937
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,018 $983 $1,018
19,050
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $282 $767 $282
5,569
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $1,940 $4,000 $1,940
36,049
kWh
-
06 2.2437: Recover waste heat from equipment $400 $650 - $400
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $290 $300 $290
5,569
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $245 $460 $245
4,689
kWh
-
09 2.2511: Insulate bare equipment $320 $200 $320
5,862
kWh
-
TOTAL RECOMMENDED $11,248 $8,410 $9,760
89,684
kWh
$1,488
-
MMBtu
TOTAL IMPLEMENTED $10,683 $7,750 $9,195
79,133
kWh
$1,488
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs