Assessment Year | 1989 |
---|---|
Principal Product | COMMERCIAL PRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 5,120
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,013 | 3,019,930 |
kWh
|
$0.054 |
Natural Gas | $6,337 | 1,517 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,248 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,683 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $5,518 | $250 |
$5,367
-
kWh
|
$151
-
MMBtu
|
|
02 | 2.6218: Turn off equipment when not in use | $1,235 | $800 |
$298
12,896
kWh
|
$937
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,018 | $983 |
$1,018
19,050
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $282 | $767 |
$282
5,569
kWh
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,940 | $4,000 |
$1,940
36,049
kWh
|
- | |
06 | 2.2437: Recover waste heat from equipment | $400 | $650 | - |
$400
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $290 | $300 |
$290
5,569
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $245 | $460 |
$245
4,689
kWh
|
- | |
09 | 2.2511: Insulate bare equipment | $320 | $200 |
$320
5,862
kWh
|
- | |
TOTAL RECOMMENDED | $11,248 | $8,410 |
$9,760
89,684
kWh
|
$1,488
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,683 | $7,750 |
$9,195
79,133
kWh
|
$1,488
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs