ITAC Assessment: OK0312
ITAC logo
ITAC Assessment: OK0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COFFEE, TEA AND SPICES
NAICS
n/a
SIC 2095: Roasted Coffee
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 1,000,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,542 153,869
kWh
Natural Gas $9,231 2,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,262 $450 - $1,262
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $300 $148 $300
4,689
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $486 $1,175 - $486
-
MMBtu
04 2.6121: Reduce hot water temperature to the minimum required $61 $51 $61
1,172
kWh
-
05 2.4312: Improve lubrication practices $69 - $69
879
kWh
-
TOTAL RECOMMENDED $2,178 $1,824 $430
6,740
kWh
$1,748
-
MMBtu
TOTAL IMPLEMENTED $1,631 $598 $369
5,568
kWh
$1,262
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs