ITAC Assessment: CO0028
ITAC logo
ITAC Assessment: CO0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product POTATO & CORN CHIPS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area
n/a
Annual Production 19,000,000
lb
Production Hrs. Annual 7,280
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,219 3,432,884
kWh
Natural Gas $505,669 104,825
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,667

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $4,738 $620 $4,738
106,096
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $23,873 $150,000 - $23,873
-
MMBtu
03 2.7492: Use proper thickness of insulation on building envelope $2,370 $10,000 - $2,370
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $653 $300 $653
14,654
kWh
-
05 2.7229: Air condition only space necessary $264 $2,000 $264
5,862
kWh
-
06 2.6124: Establish equipment maintenance schedule $2,158 $5,000 $2,158
48,359
kWh
-
07 2.2511: Insulate bare equipment $1,600 $3,000 - $1,600
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,611 $1,140 $1,611
36,049
kWh
-
TOTAL RECOMMENDED $37,267 $172,060 $9,424
211,020
kWh
$27,843
-
MMBtu
TOTAL IMPLEMENTED $35,667 $169,060 $9,424
211,020
kWh
$26,243
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs