| Assessment Year | 1985 |
|---|---|
| Principal Product | POTATO & CORN CHIPS |
| NAICS |
n/a
|
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 19,000,000
lb
|
| Production Hrs. Annual | 7,280
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $153,219 | 3,432,884 |
kWh
|
$0.045 |
| Natural Gas | $505,669 | 104,825 |
MMBtu
|
$4.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,667 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $4,738 | $620 |
$4,738
106,096
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $23,873 | $150,000 | - |
$23,873
-
MMBtu
|
|
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $2,370 | $10,000 | - |
$2,370
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $653 | $300 |
$653
14,654
kWh
|
- | |
| 05 | 2.7229: Air condition only space necessary | $264 | $2,000 |
$264
5,862
kWh
|
- | |
| 06 | 2.6124: Establish equipment maintenance schedule | $2,158 | $5,000 |
$2,158
48,359
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $1,600 | $3,000 | - |
$1,600
-
MMBtu
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,611 | $1,140 |
$1,611
36,049
kWh
|
- | |
| TOTAL RECOMMENDED | $37,267 | $172,060 |
$9,424
211,020
kWh
|
$27,843
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $35,667 | $169,060 |
$9,424
211,020
kWh
|
$26,243
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs