| Assessment Year | 2000 |
|---|---|
| Principal Product | Shell & tube heat exchangers |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 83 |
| Plant Area |
80,000
ft2
|
| Annual Production | 300
pieces
|
| Production Hrs. Annual | 8,763
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $101,340 | 2,577,667 |
kWh
|
$0.039 |
| Electricity Demand | $38,260 | 6,102 |
kW-mo/yr
|
$6.27 |
| Electricity Fees | $4,009 | - |
|
- |
| Natural Gas | $25,276 | 6,949 |
MMBtu
|
$3.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,910 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $10,200 | $11,290 | - |
$10,200
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,860 | $2,000 |
$3,860
160,903
kWh
|
- | - | - | |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $2,030 | - |
$800
33,118
kWh
|
$1,230
-
kW-mo/yr
|
- | - | |
| 04 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,440 | $780 |
$1,440
60,082
kWh
|
- | - | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,020 | $5,500 | - | - |
$1,020
-
lb
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $390 | $180 |
$30
1,172
kWh
|
$20
-
kW-mo/yr
|
- | $340 | |
| TOTAL RECOMMENDED | $18,940 | $19,750 |
$6,130
255,275
kWh
|
$11,450
-
kW-mo/yr
|
$1,020
-
lb
|
$340 | ||
| TOTAL IMPLEMENTED | $6,910 | $7,500 |
$4,660
194,021
kWh
|
$1,230
-
kW-mo/yr
|
$1,020
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs