ITAC Assessment: OK0310
ITAC logo
ITAC Assessment: OK0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BAND UNIFORMS
NAICS
n/a
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area
n/a
Annual Production 22,500
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,943 388,042
kWh
Natural Gas $13,624 3,503
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,093

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $2,570 $1,500 - $2,570
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $920 $242 $920
8,499
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,917 $776 $3,361
26,671
kWh
$(-444.0)
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $510 $850 - $510
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $96 $280 - $96
-
MMBtu
TOTAL RECOMMENDED $7,013 $3,648 $4,281
35,170
kWh
$2,732
-
MMBtu
TOTAL IMPLEMENTED $6,093 $3,406 $3,361
26,671
kWh
$2,732
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs