| Assessment Year | 1989 |
|---|---|
| Principal Product | FABRICATED STEEL |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 260 |
| Plant Area |
n/a
|
| Annual Production | 400,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $164,893 | 3,378,077 |
kWh
|
$0.049 |
| Natural Gas | $28,986 | 9,765 |
MMBtu
|
$2.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,255 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,255 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $738 | $1,250 | - |
$738
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,480 | $36,560 |
$34,462
703,107
kWh
|
- | $18 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,250 | $3,808 |
$1,366
27,843
kWh
|
- | $(-116.0) | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $400 | $825 |
$400
6,741
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $289 | $275 |
$289
4,982
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $560 | $3,432 |
$632
15,826
kWh
|
- | $(-72.0) | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,197 | $31,028 |
$10,197
318,581
kWh
|
- | - | |
| 08 | 2.2437: Recover waste heat from equipment | $6,816 | $2,140 | - |
$6,816
-
MMBtu
|
- | |
| 09 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $1,525 | - |
$1,745
54,513
kWh
|
- | $(-220.0) | |
| TOTAL RECOMMENDED | $56,255 | $79,318 |
$49,091
1,131,593
kWh
|
$7,554
-
MMBtu
|
$(-390.0) | ||
| TOTAL IMPLEMENTED | $56,255 | $79,318 |
$49,091
1,131,593
kWh
|
$7,554
-
MMBtu
|
$(-390.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs