| Assessment Year | 1996 |
|---|---|
| Principal Product | Chrome Plated Pipes |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 25 |
| Plant Area |
50,000
ft2
|
| Annual Production | 367,000,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $286,811 | 5,418,816 |
kWh
|
$0.053 |
| Electricity Demand | $182,180 | 11,710 |
kW-mo/yr
|
$15.56 |
| Natural Gas | $10,581 | 1,369 |
MMBtu
|
$7.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $35,367 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,367 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Other Liquid (haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $4,050 | $3,030 |
$4,050
49,531
kWh
|
- | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $7,102 | $550 |
$7,102
98,183
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,180 | $4,458 |
$3,180
26,671
kWh
|
- | - | |
| 04 | 2.7144: Install spectral reflectors / delamp | $2,099 | $2,480 |
$2,099
15,240
kWh
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $874 | $410 |
$874
6,155
kWh
|
- | - | |
| 06 | 3.8136: Switch to a solvent that can be cleaned and re-used | $16,297 | $1,450 | - | - |
$16,297
-
gal
|
|
| 07 | 3.4113: Treat and reuse rinse waters | $1,000 | $280 | - |
$1,000
-
Tgal
|
- | |
| 08 | 3.4113: Treat and reuse rinse waters | $765 | $200 | - |
$765
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $35,367 | $12,858 |
$17,305
195,780
kWh
|
$1,765
-
Tgal
|
$16,297
-
gal
|
||
| TOTAL IMPLEMENTED | $35,367 | $12,858 |
$17,305
195,780
kWh
|
$1,765
-
Tgal
|
$16,297
-
gal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Other Liquid (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs