ITAC Assessment: OK0282
ITAC logo
ITAC Assessment: OK0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CUSTOM BUSINESS FORMS
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area
n/a
Annual Production 1,300,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,134 3,082,943
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,071 $616 $2,071
42,790
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,240 $15,500 $10,505
303,048
kWh
$(-4,265.0)
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $505 $622 $568
9,965
kWh
- $(-63.0)
04 2.4133: Use most efficient type of electric motors $1,924 $1,809 $1,924
43,962
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,638 - $2,638
60,668
kWh
- -
06 2.7261: Install timers and/or thermostats $894 $215 $894
25,791
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $616 - $646
18,757
kWh
- $(-30.0)
08 2.3511: Use plant owned transformers or lease transformers $9,879 $15,700 $9,879
-
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,664 $23,469 $9,664
278,722
kWh
- -
TOTAL RECOMMENDED $34,431 $57,931 $38,789
783,703
kWh
$(-4,265.0)
-
MMBtu
$(-93.0)
TOTAL IMPLEMENTED $14,383 $18,140 $18,678
495,016
kWh
$(-4,265.0)
-
MMBtu
$(-30.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings