ITAC Assessment: OK0280
ITAC logo
ITAC Assessment: OK0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PROCESSED PORK & BEEF
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,375 1,085,580
kWh
Natural Gas $44,433 11,107
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,833

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $3,000 $4,600 - $3,200
-
MMBtu
$(-200.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $782 $231 $782
16,706
kWh
- -
03 2.2136: Install / repair insulation on steam lines $6,280 $893 - $6,280
-
MMBtu
-
04 2.3212: Optimize plant power factor $1,270 $3,200 $1,270
-
kWh
- -
05 2.6232: Install set-back timers $272 - $272
4,689
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $499 $602 $499
11,137
kWh
- -
TOTAL RECOMMENDED $12,103 $9,526 $2,823
32,532
kWh
$9,480
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $10,833 $6,326 $1,553
32,532
kWh
$9,480
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs