ITAC Assessment: OK0250
ITAC logo
ITAC Assessment: OK0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product JUVENILE FURNITURE
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,289 2,055,100
kWh
Natural Gas $43,713 13,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,311

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $256 - $456
14,654
kWh
- $(-200.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $751 $383 $751
12,309
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,029 $4,418 $3,029
50,117
kWh
- -
04 2.4133: Use most efficient type of electric motors $186 $291 $186
2,638
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,089 - $1,089
17,292
kWh
- -
06 2.7261: Install timers and/or thermostats $15,230 $5,100 - $15,230
-
MMBtu
-
TOTAL RECOMMENDED $20,541 $10,192 $5,511
97,010
kWh
$15,230
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $5,311 $5,092 $5,511
97,010
kWh
- $(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs