Assessment Year | 1988 |
---|---|
Principal Product | HEAT EXCHGRS. & VESSELS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 700
pieces
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,425 | 1,058,030 |
kWh
|
$0.061 |
Natural Gas | $15,458 | 3,337 |
MMBtu
|
$4.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,487 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $147 | $400 | - |
$147
-
MMBtu
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,492 | - |
$1,492
48,066
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $574 | - |
$704
22,567
kWh
|
- | $(-130.0) | |
04 | 2.2437: Recover waste heat from equipment | $1,222 | $645 | - |
$1,222
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $332 | $142 |
$332
7,034
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $212 | $447 |
$212
4,396
kWh
|
- | - | |
TOTAL RECOMMENDED | $3,979 | $1,634 |
$2,740
82,063
kWh
|
$1,369
-
MMBtu
|
$(-130.0) | ||
TOTAL IMPLEMENTED | $2,487 | $1,634 |
$1,248
33,997
kWh
|
$1,369
-
MMBtu
|
$(-130.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs