ITAC Assessment: OK0247
ITAC logo
ITAC Assessment: OK0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HEAT EXCHGRS. & VESSELS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 700
pieces
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,425 1,058,030
kWh
Natural Gas $15,458 3,337
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,487

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $147 $400 - $147
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,492 - $1,492
48,066
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $574 - $704
22,567
kWh
- $(-130.0)
04 2.2437: Recover waste heat from equipment $1,222 $645 - $1,222
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $332 $142 $332
7,034
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $212 $447 $212
4,396
kWh
- -
TOTAL RECOMMENDED $3,979 $1,634 $2,740
82,063
kWh
$1,369
-
MMBtu
$(-130.0)
TOTAL IMPLEMENTED $2,487 $1,634 $1,248
33,997
kWh
$1,369
-
MMBtu
$(-130.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs