ITAC Assessment: OK0243
ITAC logo
ITAC Assessment: OK0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product STEEL FABRICATION
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,803 1,080,891
kWh
Natural Gas $79,272 22,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,487

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,869 $7,200 $2,518
36,342
kWh
- $351
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,185 - $2,325
33,705
kWh
- $(-140.0)
03 2.7261: Install timers and/or thermostats $101 $150 - $101
-
MMBtu
-
04 2.2511: Insulate bare equipment $249 $294 - $249
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $133 $227 $133
2,052
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $68 - $68
1,172
kWh
- -
TOTAL RECOMMENDED $5,605 $7,871 $5,044
73,271
kWh
$350
-
MMBtu
$211
TOTAL IMPLEMENTED $2,487 $377 $2,526
36,929
kWh
$101
-
MMBtu
$(-140.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs