ITAC Assessment: MA0612
ITAC logo
ITAC Assessment: MA0612
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Tape heads and MEMS
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3572: Computer Storage Devices
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 208,000
ft2
Annual Production 3,640
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $863,394 12,985,347
kWh
Electricity Demand $95,631 23,044
kW-mo/yr
Electricity Fees $1,502 -
Natural Gas $402,972 26,894
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $268,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $96,635 $175,500 $75,576
1,072,000
kWh
- $21,059
-
MMBtu
02 2.4323: Use optimum size and capacity equipment $57,921 $108,000 $53,601
760,300
kWh
$4,320
-
kW-mo/yr
-
03 2.2611: Moderate cooling tower outlet temperature $23,433 $12,750 $21,686
307,600
kWh
$1,747
-
kW-mo/yr
-
04 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $21,000 $73,760 $(-4,300.0)
(-61,000)
kWh
- $25,300
-
MMBtu
05 2.7314: Reduce ventilation air $17,480 $8,040 $3,440
48,737
kWh
- $14,040
-
MMBtu
06 2.1231: Establish burner maintenance schedule for boilers $16,924 $3,200 - - $16,924
-
MMBtu
07 2.7233: Use properly designed and sized hvac equipment $14,963 $26,370 - - $14,963
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,240 $11,700 $6,240
88,476
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,610 $18,700 $4,410
62,600
kWh
$1,200
-
kW-mo/yr
-
10 2.2614: Use cooling tower or economizer to replace chiller cooling $5,532 $8,000 $4,752
67,000
kWh
$780
-
kW-mo/yr
-
11 2.4323: Use optimum size and capacity equipment $2,799 $1,800 $2,590
36,800
kWh
$209
-
kW-mo/yr
-
TOTAL RECOMMENDED $268,537 $447,820 $167,995
2,382,513
kWh
$8,256
-
kW-mo/yr
$92,286
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs