ITAC Assessment: UF0566
ITAC logo
ITAC Assessment: UF0566
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 42,350
ft2
Annual Production 685,400
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,174 3,220,200
kWh
Electricity Demand $33,179 5,673
kW-mo/yr
Electricity Fees $22,114 -
TOTAL YEARLY COSTS $206,467
RECOMMENDED SAVINGS* $481,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,527 $41,169 $9,527
202,629
kWh
- - - - - - -
02 2.4322: Use or replace with energy efficient substitutes $6,690 $2,000 $6,690
142,337
kWh
- - - - - - -
03 2.4112: Install soft-start to eliminate nuisance trips $5,976 $16,642 $5,976
127,155
kWh
- - - - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,332 - $2,015
42,872
kWh
- - - $154 $163 - -
05 3.5217: Reuse / recycle/ sell paper products $450,043 $53,000 $(-10,851.0)
(-230,868)
kWh
$(-2,548.0)
-
kW-mo/yr
$(-18,095.0)
-
MMBtu
- - - - $481,537
06 3.6192: Use a less expensive method of waste removal $4,159 $4,000 - - - - $4,159 - - -
07 3.4151: Minimize water usage $1,899 - - - - $1,899
-
Tgal
- - - -
08 4.662: Level one – add communication using iiot devices to existing control system to modify operations $1,187 - - - - - - - $1,187 -
TOTAL RECOMMENDED $481,813 $116,811 $13,357
284,125
kWh
$(-2,548.0)
-
kW-mo/yr
$(-18,095.0)
-
MMBtu
$1,899
-
Tgal
$4,313 $163 $1,187 $481,537
TOTAL IMPLEMENTED $20,921 $57,811 $17,518
372,656
kWh
- - $1,899
-
Tgal
$154 $163 $1,187 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs