ITAC Assessment: OK0241
ITAC logo
ITAC Assessment: OK0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product WESTERN WEAR CLOTHING
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,895 237,397
kWh
Natural Gas $10,045 2,338
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,960 $6,525 $1,960
22,274
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $148 $71 $148
586
kWh
-
03 2.2511: Insulate bare equipment $297 $288 - $297
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $1,273 $1,050 - $1,273
-
MMBtu
05 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $735 $2,083 $735
7,913
kWh
-
06 2.1222: Install turbulators $108 $220 - $108
-
MMBtu
07 2.2121: Increase amount of condensate returned $82 $220 - $82
-
MMBtu
08 2.2111: Install steam trap $612 $1,950 - $612
-
MMBtu
TOTAL RECOMMENDED $5,215 $12,407 $2,843
30,773
kWh
$2,372
-
MMBtu
TOTAL IMPLEMENTED $2,520 $3,799 $148
586
kWh
$2,372
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs