Assessment Year | 1987 |
---|---|
Principal Product | WESTERN WEAR CLOTHING |
NAICS |
n/a
|
SIC | 2329: Men's and Boys' Clothing, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $17,895 | 237,397 |
kWh
|
$0.075 |
Natural Gas | $10,045 | 2,338 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,215 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,520 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,960 | $6,525 |
$1,960
22,274
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $148 | $71 |
$148
586
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $297 | $288 | - |
$297
-
MMBtu
|
|
04 | 2.7221: Lower temperature during the winter season and vice-versa | $1,273 | $1,050 | - |
$1,273
-
MMBtu
|
|
05 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $735 | $2,083 |
$735
7,913
kWh
|
- | |
06 | 2.1222: Install turbulators | $108 | $220 | - |
$108
-
MMBtu
|
|
07 | 2.2121: Increase amount of condensate returned | $82 | $220 | - |
$82
-
MMBtu
|
|
08 | 2.2111: Install steam trap | $612 | $1,950 | - |
$612
-
MMBtu
|
|
TOTAL RECOMMENDED | $5,215 | $12,407 |
$2,843
30,773
kWh
|
$2,372
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,520 | $3,799 |
$148
586
kWh
|
$2,372
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs