ITAC Assessment: OK0232
ITAC logo
ITAC Assessment: OK0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product STEEL BUILDINGS
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,890 421,454
kWh
Natural Gas $13,517 3,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,022 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,847

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,206 $4,449 $2,206
65,651
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $46 $68 $46
586
kWh
-
03 2.7261: Install timers and/or thermostats $451 $225 $451
14,947
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $129 $200 $353
11,723
kWh
$(-224.0)
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $190 - $190
2,638
kWh
-
TOTAL RECOMMENDED $3,022 $4,942 $3,246
95,545
kWh
$(-224.0)
-
MMBtu
TOTAL IMPLEMENTED $2,847 $4,674 $2,847
83,236
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs