ITAC Assessment: OK0231
ITAC logo
ITAC Assessment: OK0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product TRANSFORMERS
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $5
M
to 10
M
# of Employees 83
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,032
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,636 1,158,558
kWh
Natural Gas $31,125 11,350
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $604 $227 $604
11,723
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,188 $1,372 $1,188
25,791
kWh
- -
03 2.7261: Install timers and/or thermostats $3,831 $1,300 - $3,831
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $107 - $227
7,034
kWh
- $(-120.0)
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $192 $500 $297
9,086
kWh
$(-105.0)
-
MMBtu
-
07 2.2414: Use waste heat from hot flue gases to preheat $836 $145 - $836
-
MMBtu
-
TOTAL RECOMMENDED $6,758 $3,544 $2,316
53,634
kWh
$4,562
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $5,730 $2,899 $2,019
44,548
kWh
$3,831
-
MMBtu
$(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs