ITAC Assessment: OK0226
ITAC logo
ITAC Assessment: OK0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product OIL WELLHEAD EQUIPMENT
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,016 2,401,524
kWh
Natural Gas $29,963 7,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,571

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,186 $2,600 - $1,306
-
MMBtu
$(-120.0)
02 2.7314: Reduce ventilation air $732 $100 $732
16,413
kWh
- -
03 2.7261: Install timers and/or thermostats $3,691 $1,575 - $3,691
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $40 - $120
3,224
kWh
- $(-80.0)
05 2.7111: Reduce illumination to minimum necessary levels $162 $140 $162
2,931
kWh
- -
06 2.7111: Reduce illumination to minimum necessary levels $618 $40 $618
9,086
kWh
- -
07 2.7111: Reduce illumination to minimum necessary levels $41 $20 $41
879
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $254 $150 $254
2,638
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $944 $86 $944
16,120
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $150 $300 $150
1,465
kWh
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $412 $400 $412
7,034
kWh
- -
TOTAL RECOMMENDED $8,230 $5,411 $3,433
59,790
kWh
$4,997
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $7,571 $5,351 $2,774
49,825
kWh
$4,997
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings