ITAC Assessment: OK0218
ITAC logo
ITAC Assessment: OK0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product GALV. STEEL PRODUCTS
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area
n/a
Annual Production 72,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,776 398,007
kWh
Natural Gas $338,627 94,626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $291 $255 $291
9,379
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,933 $1,500 - $4,053
-
MMBtu
$(-120.0)
03 2.2136: Install / repair insulation on steam lines $1,296 $965 - $1,296
-
MMBtu
-
04 2.2514: Cover open tanks $7,769 $3,608 - $7,769
-
MMBtu
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $780 $465 - $780
-
MMBtu
-
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,136 $503 - $1,136
-
MMBtu
-
07 2.2414: Use waste heat from hot flue gases to preheat $25,085 $52,000 - $25,085
-
MMBtu
-
TOTAL RECOMMENDED $40,290 $59,296 $291
9,379
kWh
$40,119
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $6,140 $2,723 $291
9,379
kWh
$5,969
-
MMBtu
$(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs