| Assessment Year | 1987 |
|---|---|
| Principal Product | GALV. STEEL PRODUCTS |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 125 |
| Plant Area |
n/a
|
| Annual Production | 72,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $21,776 | 398,007 |
kWh
|
$0.055 |
| Natural Gas | $338,627 | 94,626 |
MMBtu
|
$3.58 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,140 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $291 | $255 |
$291
9,379
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,933 | $1,500 | - |
$4,053
-
MMBtu
|
$(-120.0) | |
| 03 | 2.2136: Install / repair insulation on steam lines | $1,296 | $965 | - |
$1,296
-
MMBtu
|
- | |
| 04 | 2.2514: Cover open tanks | $7,769 | $3,608 | - |
$7,769
-
MMBtu
|
- | |
| 05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $780 | $465 | - |
$780
-
MMBtu
|
- | |
| 06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,136 | $503 | - |
$1,136
-
MMBtu
|
- | |
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $25,085 | $52,000 | - |
$25,085
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $40,290 | $59,296 |
$291
9,379
kWh
|
$40,119
-
MMBtu
|
$(-120.0) | ||
| TOTAL IMPLEMENTED | $6,140 | $2,723 |
$291
9,379
kWh
|
$5,969
-
MMBtu
|
$(-120.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs