ITAC Assessment: GT0545
ITAC logo
ITAC Assessment: GT0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Hair Care Products
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area
n/a
Annual Production 93,000,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,341 2,229,777
kWh
Natural Gas $30,140 4,698
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $25,370 - $25,370
374,853
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,800 $14,340 $6,800
100,528
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,480 $3,780 $1,480
21,981
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $923 $3,100 - $923
-
MMBtu
05 2.4322: Use or replace with energy efficient substitutes $3,400 $12,000 $3,400
50,117
kWh
-
TOTAL RECOMMENDED $37,973 $33,220 $37,050
547,479
kWh
$923
-
MMBtu
TOTAL IMPLEMENTED $37,050 $30,120 $37,050
547,479
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs