Assessment Year 1987
Principal Product SHELL & TUBE HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 107
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,300
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,303 2,247,069
kWh
Natural Gas $30,501 8,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $57 $43 $57
1,172
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,929 $24,647 $10,966
273,154
kWh
- $(-37.0)
03 2.4322: Use or replace with energy efficient substitutes $638 - $578
18,757
kWh
- $60
04 2.2437: Recover waste heat from equipment $7,800 $1,155 - $7,800
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,319 - $2,629
84,701
kWh
- $(-310.0)
06 2.6212: Turn off equipment during breaks, reduce operating time $870 $230 $90
2,931
kWh
- $780
07 2.7261: Install timers and/or thermostats $1,059 $450 $1,059
34,291
kWh
- -
TOTAL RECOMMENDED $23,672 $26,525 $15,379
415,006
kWh
$7,800
-
MMBtu
$493
TOTAL IMPLEMENTED $15,002 $25,140 $15,289
412,075
kWh
- $(-287.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs