ITAC Assessment: OK0213
ITAC logo
ITAC Assessment: OK0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SONIC EQUIPMENT
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area
n/a
Annual Production 2,750,000
pieces
Production Hrs. Annual 2,535
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,680 245,018
kWh
Natural Gas $3,297 718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $987

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $100 $62 $100
1,465
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $70 $146 $70
1,172
kWh
-
03 2.3191: Use demand controller or load shedder $2,542 $510 $2,542
-
kWh
-
04 2.7231: Use radiant heater for spot heating $817 $3,200 - $817
-
MMBtu
05 2.7261: Install timers and/or thermostats $473 $450 - $473
-
MMBtu
TOTAL RECOMMENDED $4,002 $4,368 $2,712
2,637
kWh
$1,290
-
MMBtu
TOTAL IMPLEMENTED $987 $3,408 $170
2,637
kWh
$817
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs