ITAC Assessment: OK0206
ITAC logo
ITAC Assessment: OK0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product DOWN HOLE OIL GAGES
NAICS
n/a
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,847 1,992,966
kWh
Natural Gas $7,247 1,763
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $1,270 $3,500 $1,270
29,308
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,340 $1,056 $3,730
59,789
kWh
$(-390.0)
-
MMBtu
03 2.1221: Replace obsolete burners with more efficient ones $743 $4,000 - $743
-
MMBtu
TOTAL RECOMMENDED $5,353 $8,556 $5,000
89,097
kWh
$353
-
MMBtu
TOTAL IMPLEMENTED $5,353 $8,556 $5,000
89,097
kWh
$353
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs