ITAC Assessment: OK0200
ITAC logo
ITAC Assessment: OK0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product LADIES'CLOTHING
NAICS
n/a
SIC 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,235 667,937
kWh
Natural Gas $16,541 4,132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $1,274 $5,000 $1,274
28,136
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $3,679 $4,000 $3,679
101,114
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,249 $7,000 $2,249
34,584
kWh
-
04 2.7233: Use properly designed and sized hvac equipment $924 $2,355 - $924
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $639 $1,000 - $639
-
MMBtu
TOTAL RECOMMENDED $8,765 $19,355 $7,202
163,834
kWh
$1,563
-
MMBtu
TOTAL IMPLEMENTED $5,242 $7,355 $3,679
101,114
kWh
$1,563
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs