| Assessment Year | 1986 |
|---|---|
| Principal Product | OPTHALMIC MACHINERY |
| NAICS |
n/a
|
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 380 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $183,961 | 3,728,312 |
kWh
|
$0.049 |
| Natural Gas | $32,131 | 7,736 |
MMBtu
|
$4.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,578 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,883 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $1,722 | $426 | - |
$1,722
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $340 | $60 |
$340
7,034
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $101 | $49 |
$101
2,345
kWh
|
- | |
| 04 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $5,532 | $22,000 |
$5,532
104,631
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,027 | $276 |
$9,339
240,035
kWh
|
$(-1,312.0)
-
MMBtu
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,856 | $3,272 |
$3,925
82,063
kWh
|
$(-69.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,578 | $26,083 |
$19,237
436,108
kWh
|
$341
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,883 | $3,548 |
$13,264
322,098
kWh
|
$(-1,381.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs