| Assessment Year | 1986 |
|---|---|
| Principal Product | CORRUGATED SHIPPING BOX |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 500,000
thousand feet
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $158,176 | 3,289,859 |
kWh
|
$0.048 |
| Natural Gas | $137,674 | 38,731 |
MMBtu
|
$3.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,097 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,774 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $2,964 | $3,200 | - |
$2,964
-
MMBtu
|
- | |
| 02 | 2.2122: Install / repair insulation on condensate lines | $369 | $360 | - |
$369
-
MMBtu
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,954 | $1,500 | - |
$2,954
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $547 | $80 |
$547
14,947
kWh
|
- | - | |
| 05 | 2.4312: Improve lubrication practices | $11,758 | - |
$12,958
245,311
kWh
|
- | $(-1,200.0) | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $817 | $782 |
$893
16,706
kWh
|
$(-76.0)
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,696 | $2,411 |
$1,415
26,671
kWh
|
- | $281 | |
| 08 | 2.7444: Close holes and openings in building such as broken windows | $1,916 | $249 |
$155
4,396
kWh
|
$1,761
-
MMBtu
|
- | |
| 09 | 2.4133: Use most efficient type of electric motors | $76 | $47 |
$76
1,465
kWh
|
- | - | |
| TOTAL RECOMMENDED | $23,097 | $8,629 |
$16,044
309,496
kWh
|
$7,972
-
MMBtu
|
$(-919.0) | ||
| TOTAL IMPLEMENTED | $19,774 | $6,769 |
$16,044
309,496
kWh
|
$4,649
-
MMBtu
|
$(-919.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs