ITAC Assessment: OK0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 750
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,650 1,939,918
kWh
Natural Gas $34,678 9,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $518

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $116 $103 $116
2,052
kWh
-
02 2.7261: Install timers and/or thermostats $277 $700 - $277
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $125 $40 $125
4,396
kWh
-
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,104 $700 $1,100
38,687
kWh
$1,004
-
MMBtu
05 2.7231: Use radiant heater for spot heating $10,251 $54,400 - $10,251
-
MMBtu
TOTAL RECOMMENDED $12,873 $55,943 $1,341
45,135
kWh
$11,532
-
MMBtu
TOTAL IMPLEMENTED $518 $843 $241
6,448
kWh
$277
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs