ITAC Assessment: OK0185
ITAC logo
ITAC Assessment: OK0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CAST BRONZE LETTERS
NAICS
n/a
SIC 3366: Copper Foundries
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area
n/a
Annual Production 2,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,903 269,930
kWh
Natural Gas $28,834 7,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $166 $54 $166
2,052
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $959 $120 $959
12,603
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $508 $1,300 - $508
-
MMBtu
04 2.8114: Change rate schedules or other changes in utility service $1,083 $3,050 $1,083
-
kWh
-
TOTAL RECOMMENDED $2,716 $4,524 $2,208
14,655
kWh
$508
-
MMBtu
TOTAL IMPLEMENTED $2,716 $4,524 $2,208
14,655
kWh
$508
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs