ITAC Assessment: OK0183
ITAC logo
ITAC Assessment: OK0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ROTARY DRILL BITS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area
n/a
Annual Production 43,800
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,817 4,548,066
kWh
Natural Gas $107,183 29,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $791 - $1,291
33,998
kWh
- $(-500.0)
02 2.6232: Install set-back timers $1,482 $845 $1,482
38,980
kWh
- -
03 2.2414: Use waste heat from hot flue gases to preheat $13,118 $36,015 - $13,118
-
MMBtu
-
04 2.2425: Use flue gases to heat process or service water $6,158 $5,270 - $6,158
-
MMBtu
-
05 3.4115: Recover and reuse cooling water $34,172 $33,600 $4,097
107,562
kWh
- $30,075
TOTAL RECOMMENDED $55,721 $75,730 $6,870
180,540
kWh
$19,276
-
MMBtu
$29,575
TOTAL IMPLEMENTED $2,273 $845 $2,773
72,978
kWh
- $(-500.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs