Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Surfactant chemicals, surface active agents for textiles, coastings
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 60,000
ft2
Annual Production 2,500
ton
Production Hrs. Annual 4,030
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,593 1,290,735
kWh
Natural Gas $46,762 6,376
MMBtu
TOTAL YEARLY COSTS $147,355
RECOMMENDED SAVINGS* $6,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,068 $3,800 - $2,068
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,965 $2,800 $2,965
38,065
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $954 - $954
12,249
kWh
-
04 2.6211: Conserve energy by efficient use of vending machines $106 $180 $106
1,361
kWh
-
TOTAL RECOMMENDED $6,093 $6,780 $4,025
51,675
kWh
$2,068
-
MMBtu
TOTAL IMPLEMENTED - - - -