ITAC Assessment: OK0177
ITAC logo
ITAC Assessment: OK0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FLOUR & MILL FEED
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area
n/a
Annual Production 43,000,000
lb
Production Hrs. Annual 7,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $779,800 18,825,030
kWh
Natural Gas $27,888 7,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,611 $1,080 $1,611
48,945
kWh
- -
02 2.4133: Use most efficient type of electric motors $594 $559 $594
15,240
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,014 $1,950 $14,014
366,647
kWh
- -
04 2.6232: Install set-back timers $493 $250 $493
10,551
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $505 - $505
13,189
kWh
- -
06 2.7261: Install timers and/or thermostats $280 $165 - $280
-
MMBtu
-
07 2.2444: Use hot process fluids to preheat incoming process fluids $3,428 $625 - $2,468
-
MMBtu
$960
TOTAL RECOMMENDED $20,925 $4,629 $17,217
454,572
kWh
$2,748
-
MMBtu
$960
TOTAL IMPLEMENTED $16,499 $3,754 $16,219
430,832
kWh
$280
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs