ITAC Assessment: OK0171
ITAC logo
ITAC Assessment: OK0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product AUDIO COMPONENTS
NAICS
n/a
SIC 3651: Household Audio and Video Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,996 2,531,067
kWh
Natural Gas $61,986 15,555
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,279

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $965 $700 $965
23,447
kWh
- -
02 2.7261: Install timers and/or thermostats $20,880 $1,500 - $20,880
-
MMBtu
-
03 2.3212: Optimize plant power factor $690 $1,315 $690
-
kWh
- -
04 2.2532: Use only amount of air necessary to prevent explosion hazard $4,668 $50 $2,927
76,788
kWh
$1,741
-
MMBtu
-
05 2.2511: Insulate bare equipment $55 $130 - $55
-
MMBtu
-
06 3.4151: Minimize water usage $2,464 - - - $2,464
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $557 $420 $557
16,999
kWh
- -
TOTAL RECOMMENDED $30,279 $4,115 $5,139
117,234
kWh
$22,676
-
MMBtu
$2,464
TOTAL IMPLEMENTED $30,279 $4,115 $5,139
117,234
kWh
$22,676
-
MMBtu
$2,464
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs