| Assessment Year | 2004 |
|---|---|
| Principal Product | Wood Kitched Cabinets and Countertops |
| NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $50 M to 100M |
| # of Employees | 450 |
| Plant Area |
135,000
ft2
|
| Annual Production | 2,627,620
thousand feet
|
| Production Hrs. Annual | 4,550
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $320,013 | 2,786,156 |
kWh
|
$0.11 |
| Electricity Demand | $94,436 | 7,565 |
kW-mo/yr
|
$12.48 |
| Natural Gas | $21,727 | 2,959 |
MMBtu
|
$7.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $97,337 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $49,138 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,433 | - |
$2,433
21,194
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,113 | $720 |
$5,113
30,260
kWh
|
- | - | |
| 03 | 2.7131: Add area lighting switches | $9,569 | $1,464 |
$5,573
48,558
kWh
|
$3,996
-
kW-mo/yr
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,135 | $222 |
$790
6,882
kWh
|
$345
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,810 | $5,675 |
$2,461
21,438
kWh
|
$1,349
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,732 | $78,810 |
$22,444
195,501
kWh
|
$7,288
-
kW-mo/yr
|
- | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,676 | $22,891 |
$6,676
58,153
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $914 | $3,294 |
$658
5,733
kWh
|
$256
-
kW-mo/yr
|
- | |
| 09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $37,955 | $102,295 | - | - |
$37,955
-
lb
|
|
| TOTAL RECOMMENDED | $97,337 | $215,371 |
$46,148
387,719
kWh
|
$13,234
-
kW-mo/yr
|
$37,955
-
lb
|
||
| TOTAL IMPLEMENTED | $49,138 | $89,963 |
$36,249
301,490
kWh
|
$12,889
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs