Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CENTRIFUGAL PUMPS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area
n/a
Annual Production 1,050
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,749 80,012
kWh
Natural Gas $5,625 1,123
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $399 $63 $399
5,569
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $76 $77 $65
879
kWh
- $11
03 2.7142: Utilize higher efficiency lamps and/or ballasts $389 $385 $389
5,569
kWh
- -
04 2.7261: Install timers and/or thermostats $1,595 $1,005 - $1,595
-
MMBtu
-
TOTAL RECOMMENDED $2,459 $1,530 $853
12,017
kWh
$1,595
-
MMBtu
$11
TOTAL IMPLEMENTED $2,459 $1,530 $853
12,017
kWh
$1,595
-
MMBtu
$11
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs