ITAC Assessment: OK0164
ITAC logo
ITAC Assessment: OK0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MAGNETIC TAPE
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,336 1,797,186
kWh
Natural Gas $20,734 4,527
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,277

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,930 $891 $1,930
36,928
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $304 $47 $304
9,379
kWh
-
03 2.7231: Use radiant heater for spot heating $1,900 $2,215 - $1,900
-
MMBtu
04 2.6218: Turn off equipment when not in use $133 $150 $89
2,638
kWh
$44
-
MMBtu
05 2.7111: Reduce illumination to minimum necessary levels $314 $600 $314
9,379
kWh
-
TOTAL RECOMMENDED $4,581 $3,903 $2,637
58,324
kWh
$1,944
-
MMBtu
TOTAL IMPLEMENTED $4,277 $3,856 $2,333
48,945
kWh
$1,944
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs