ITAC Assessment: OK0161
ITAC logo
ITAC Assessment: OK0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CAULK & PLASTIC TUBES
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 11,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,994 2,844,959
kWh
Natural Gas $18,982 4,852
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,936

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,880 $874 $1,880
55,100
kWh
-
02 2.3212: Optimize plant power factor $2,436 $5,915 $2,436
-
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $240 $95 $240
10,551
kWh
-
04 2.2437: Recover waste heat from equipment $2,080 $100 - $2,080
-
MMBtu
05 2.7231: Use radiant heater for spot heating $11,300 $3,959 - $11,300
-
MMBtu
06 2.2532: Use only amount of air necessary to prevent explosion hazard $3,733 $3,500 $3,630
62,427
kWh
$103
-
MMBtu
TOTAL RECOMMENDED $21,669 $14,443 $8,186
128,078
kWh
$13,483
-
MMBtu
TOTAL IMPLEMENTED $17,936 $10,943 $4,556
65,651
kWh
$13,380
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs