Assessment Year | 1985 |
---|---|
Principal Product | CAULK & PLASTIC TUBES |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 11,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,994 | 2,844,959 |
kWh
|
$0.037 |
Natural Gas | $18,982 | 4,852 |
MMBtu
|
$3.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,669 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,936 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,880 | $874 |
$1,880
55,100
kWh
|
- | |
02 | 2.3212: Optimize plant power factor | $2,436 | $5,915 |
$2,436
-
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $240 | $95 |
$240
10,551
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,080 | $100 | - |
$2,080
-
MMBtu
|
|
05 | 2.7231: Use radiant heater for spot heating | $11,300 | $3,959 | - |
$11,300
-
MMBtu
|
|
06 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $3,733 | $3,500 |
$3,630
62,427
kWh
|
$103
-
MMBtu
|
|
TOTAL RECOMMENDED | $21,669 | $14,443 |
$8,186
128,078
kWh
|
$13,483
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,936 | $10,943 |
$4,556
65,651
kWh
|
$13,380
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs