Assessment Year | 2018 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $100 M to 500M |
# of Employees | 225 |
Plant Area |
130,000
ft2
|
Annual Production | 320,000
bbl
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $607,515 | 6,200,282 |
kWh
|
$0.098 | |
Electricity Demand | $543,908 | 15,755 |
kW-mo/yr
|
$34.52 | |
Natural Gas | $272,405 | 36,732 |
MMBtu
|
$7.42 | |
Waste Disposal Costs | |||||
Water Usage | $47,700 | 6,732 |
Tgal
|
$7.09 | |
TOTAL YEARLY COSTS | $1,471,528 | ||||
RECOMMENDED SAVINGS* | $621,769 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $534,492 | $1,824,000 |
$355,680
4,560,000
kWh
|
$331,392
-
kW-mo/yr
|
$(-152,580.0)
-
MMBtu
|
- | - | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $46,211 | $152,126 |
$(-3,318.0)
(-33,857)
kWh
|
$49,529
-
kW-mo/yr
|
- | - | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $21,481 | $37,900 | - | - |
$21,481
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,884 | $14,697 |
$4,599
46,922
kWh
|
$5,116
-
kW-mo/yr
|
- | - | $169 | |
05 | 2.1241: Reduce excessive boiler blowdown | $8,114 | $11,774 | - | - |
$5,349
-
MMBtu
|
$2,765
-
Tgal
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,587 | $600 |
$1,587
16,203
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $621,769 | $2,041,097 |
$358,548
4,589,268
kWh
|
$386,037
-
kW-mo/yr
|
$(-125,750.0)
-
MMBtu
|
$2,765
-
Tgal
|
$169 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs