ITAC Assessment: SD0559
ITAC logo
ITAC Assessment: SD0559
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 130,000
ft2
Annual Production 320,000
bbl
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $607,515 6,200,282
kWh
Electricity Demand $543,908 15,755
kW-mo/yr
Natural Gas $272,405 36,732
MMBtu
Waste Disposal Costs
Water Usage $47,700 6,732
Tgal
TOTAL YEARLY COSTS $1,471,528
RECOMMENDED SAVINGS* $621,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $534,492 $1,824,000 $355,680
4,560,000
kWh
$331,392
-
kW-mo/yr
$(-152,580.0)
-
MMBtu
- -
02 2.3132: Recharge batteries on during off-peak demand periods $46,211 $152,126 $(-3,318.0)
(-33,857)
kWh
$49,529
-
kW-mo/yr
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $21,481 $37,900 - - $21,481
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,884 $14,697 $4,599
46,922
kWh
$5,116
-
kW-mo/yr
- - $169
05 2.1241: Reduce excessive boiler blowdown $8,114 $11,774 - - $5,349
-
MMBtu
$2,765
-
Tgal
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,587 $600 $1,587
16,203
kWh
- - - -
TOTAL RECOMMENDED $621,769 $2,041,097 $358,548
4,589,268
kWh
$386,037
-
kW-mo/yr
$(-125,750.0)
-
MMBtu
$2,765
-
Tgal
$169
TOTAL IMPLEMENTED - - - - - - -