ITAC Assessment: OK0149
ITAC logo
ITAC Assessment: OK0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FROZEN WAFFLES
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 200
Plant Area
n/a
Annual Production 18,250,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,447 8,310,082
kWh
Natural Gas $270,256 54,251
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $363 $650 - $483
-
MMBtu
$(-120.0)
02 2.7226: Use computer programs to optimize hvac performance $3,221 $2,000 $3,221
89,097
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $351 $220 $351
9,672
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $625 $1,700 $1,315
29,601
kWh
- $(-690.0)
05 2.2122: Install / repair insulation on condensate lines $360 $104 - $360
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $3,556 $785 - $3,556
-
MMBtu
-
07 2.2122: Install / repair insulation on condensate lines $126 $235 - $126
-
MMBtu
-
08 2.2511: Insulate bare equipment $155 $235 - $155
-
MMBtu
-
09 2.3132: Recharge batteries on during off-peak demand periods $826 - $826
-
kWh
- -
10 2.3191: Use demand controller or load shedder $2,537 $480 $2,537
-
kWh
- -
TOTAL RECOMMENDED $12,120 $6,409 $8,250
128,370
kWh
$4,680
-
MMBtu
$(-810.0)
TOTAL IMPLEMENTED $8,899 $4,409 $5,029
39,273
kWh
$4,680
-
MMBtu
$(-810.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs