Assessment Year | 1984 |
---|---|
Principal Product | FROZEN WAFFLES |
NAICS |
n/a
|
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 18,250,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $275,447 | 8,310,082 |
kWh
|
$0.033 |
Natural Gas | $270,256 | 54,251 |
MMBtu
|
$4.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,899 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $363 | $650 | - |
$483
-
MMBtu
|
$(-120.0) | |
02 | 2.7226: Use computer programs to optimize hvac performance | $3,221 | $2,000 |
$3,221
89,097
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $351 | $220 |
$351
9,672
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $625 | $1,700 |
$1,315
29,601
kWh
|
- | $(-690.0) | |
05 | 2.2122: Install / repair insulation on condensate lines | $360 | $104 | - |
$360
-
MMBtu
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $3,556 | $785 | - |
$3,556
-
MMBtu
|
- | |
07 | 2.2122: Install / repair insulation on condensate lines | $126 | $235 | - |
$126
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $155 | $235 | - |
$155
-
MMBtu
|
- | |
09 | 2.3132: Recharge batteries on during off-peak demand periods | $826 | - |
$826
-
kWh
|
- | - | |
10 | 2.3191: Use demand controller or load shedder | $2,537 | $480 |
$2,537
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,120 | $6,409 |
$8,250
128,370
kWh
|
$4,680
-
MMBtu
|
$(-810.0) | ||
TOTAL IMPLEMENTED | $8,899 | $4,409 |
$5,029
39,273
kWh
|
$4,680
-