Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Adhesive Tape
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 30,000
ft2
Annual Production 20,000
thousand feet
Production Hrs. Annual 2,288
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,237 476,320
kWh
Electricity Demand $8,078 1,154
kW-mo/yr
Natural Gas $95,705 11,090
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $3,716 $4,442 $(-132.0)
(-1,390)
kWh
$(-27.0)
-
kW-mo/yr
$3,875
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,906 $9,000 $2,906
30,590
kWh
- -
03 2.2691: Shut off cooling if cold outside air will cool process $1,535 $3,900 $1,535
16,160
kWh
- -
TOTAL RECOMMENDED $8,157 $17,342 $4,309
45,360
kWh
$(-27.0)
-
kW-mo/yr
$3,875
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs