Assessment Year | 1984 |
---|---|
Principal Product | BUSINESS FORMS |
NAICS |
n/a
|
SIC | 2761: Manifold Business Forms |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
n/a
|
Annual Production | 600,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $80,152 | 1,793,963 |
kWh
|
$0.045 |
Natural Gas | $19,744 | 4,667 |
MMBtu
|
$4.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,769 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,260 | $3,170 |
$3,260
84,994
kWh
|
- | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $90 | $297 |
$90
2,638
kWh
|
- | |
03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,294 | $320 |
$1,294
34,291
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $168 | $180 |
$168
5,275
kWh
|
- | |
05 | 2.6121: Reduce hot water temperature to the minimum required | $460 | - | - |
$460
-
MMBtu
|
|
06 | 2.7444: Close holes and openings in building such as broken windows | $384 | $80 | - |
$384
-
MMBtu
|
|
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $183 | - |
$413
12,896
kWh
|
$(-230.0)
-
MMBtu
|
|
08 | 2.7212: Install or upgrade insulation on hvac distribution systems | $206 | $472 | - |
$206
-
MMBtu
|
|
09 | 2.7226: Use computer programs to optimize hvac performance | $9,724 | $10,340 |
$9,724
300,996
kWh
|
- | |
TOTAL RECOMMENDED | $15,769 | $14,859 |
$14,949
441,090
kWh
|
$820
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs