ITAC Assessment: OK0144
ITAC logo
ITAC Assessment: OK0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product RECYCLED FERROUS METALS
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,450
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,460 1,308,031
kWh
Natural Gas $64,733 17,624
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,469 $450 - $3,559
-
MMBtu
$(-90.0)
02 2.2511: Insulate bare equipment $1,714 $580 - $1,714
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $200 $400 - $200
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $280 - $220
3,517
kWh
- $60
05 2.7142: Utilize higher efficiency lamps and/or ballasts $212 $427 $161
2,638
kWh
- $51
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $93 - $93
1,465
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $90 $30 $90
1,465
kWh
- -
TOTAL RECOMMENDED $6,058 $1,887 $564
9,085
kWh
$5,473
-
MMBtu
$21
TOTAL IMPLEMENTED $595 $857 $344
5,568
kWh
$200
-
MMBtu
$51
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs