ITAC Assessment: ME0158
ITAC logo
ITAC Assessment: ME0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Frozen Potato Products
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 625,000
ft2
Annual Production 200,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,405,601 35,946,659
kWh
Fuel Oil #6 $778,864 308,673
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,529

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $22,418 - - - $22,418
02 2.3137: Use power during off-peak periods $9,670 - - - $9,670
03 2.8121: Apply for tax-free status for energy purchases $7,400 - - - $7,400
04 2.1113: Reduce combustion air flow to optimum $5,257 $400 - $5,257
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,540 $8,745 $3,674
77,081
kWh
$(-134.0)
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $3,575 $300 $3,575
54,513
kWh
- -
07 2.2511: Insulate bare equipment $466 $750 - $466
-
MMBtu
-
TOTAL RECOMMENDED $52,326 $10,195 $7,249
131,594
kWh
$5,589
-
MMBtu
$39,488
TOTAL IMPLEMENTED $43,529 $1,050 $3,575
54,513
kWh
$466
-
MMBtu
$39,488
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs