Assessment Year | 1995 |
---|---|
Principal Product | Frozen Potato Products |
NAICS |
n/a
|
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
625,000
ft2
|
Annual Production | 200,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,405,601 | 35,946,659 |
kWh
|
$0.067 |
Fuel Oil #6 | $778,864 | 308,673 |
MMBtu
|
$2.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,326 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,529 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $22,418 | - | - | - | $22,418 | |
02 | 2.3137: Use power during off-peak periods | $9,670 | - | - | - | $9,670 | |
03 | 2.8121: Apply for tax-free status for energy purchases | $7,400 | - | - | - | $7,400 | |
04 | 2.1113: Reduce combustion air flow to optimum | $5,257 | $400 | - |
$5,257
-
MMBtu
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,540 | $8,745 |
$3,674
77,081
kWh
|
$(-134.0)
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,575 | $300 |
$3,575
54,513
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $466 | $750 | - |
$466
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $52,326 | $10,195 |
$7,249
131,594
kWh
|
$5,589
-
MMBtu
|
$39,488 | ||
TOTAL IMPLEMENTED | $43,529 | $1,050 |
$3,575
54,513
kWh
|
$466
-
MMBtu
|
$39,488 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs