ITAC Assessment: OK0141
ITAC logo
ITAC Assessment: OK0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PRINTED MATERIALS
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 320,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,162 812,427
kWh
Natural Gas $9,992 2,235
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $233 $325 - $233
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,645 $361 $1,645
36,928
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $375 $195 $375
9,672
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $48 $70 $48
1,758
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $756 $332 $756
12,603
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $128 - $128
2,345
kWh
-
TOTAL RECOMMENDED $3,185 $1,283 $2,952
63,306
kWh
$233
-
MMBtu
TOTAL IMPLEMENTED $2,682 $1,088 $2,449
51,289
kWh
$233
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs