ITAC Assessment: MO0093
ITAC logo
ITAC Assessment: MO0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Dimensioned Hardwood
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 200,000
ft2
Annual Production 5,200,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,110 7,332,650
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $186,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $167,626 $180,000 - $167,626
02 2.4133: Use most efficient type of electric motors $10,564 $25,288 $10,564
194,021
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,313 $1,005 $4,313
79,132
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,300 $5,978 $1,300
24,033
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $994 $369 $994
18,171
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $1,643 $464 $1,643
30,188
kWh
-
TOTAL RECOMMENDED $186,440 $213,104 $18,814
345,545
kWh
$167,626
TOTAL IMPLEMENTED $18,814 $33,104 $18,814
345,545
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs